Submittal control
Submittals
Each requirement includes where it was found in the plans/specs and a concise action summary so a PM can understand the next step fast.
3 records
Submittal Requirement Queue
SUB-001 / Shop drawings
Revise And ResubmitRiverfront Medical Office Building / due Mar 20, 2026
Curtain wall and storefront elevations, anchors, movement joints, glass types, and hardware coordination.
Found at: Spec 08 44 13 Glazed Aluminum Curtain Walls; plans A201, A301, A502, A701; details A502/4 head, A502/7 sill, A701/2 vertical mullion at slab edge.
Requirement summary: Required by Northstar Builders; responsible party Drafting Manager; current status REVISE AND RESUBMIT.
SUB-002 / Structural calculations
SubmittedRiverfront Medical Office Building / due Mar 27, 2026
Delegated design calculations for curtain wall, storefront, anchors, and glass thickness.
Found at: Spec 08 44 13 Glazed Aluminum Curtain Walls; plans A201, A301, A502, A701; details A502/4 head, A502/7 sill, A701/2 vertical mullion at slab edge.
Requirement summary: Required by Architect; responsible party Engineering Consultant; current status SUBMITTED.
SUB-003 / Glass and finish samples
Approved As NotedRiverfront Medical Office Building / due Apr 3, 2026
Clear anodized finish, low-e IGU sample, laminated glass sample, and fire-rated glazing label sample.
Found at: Spec 08 80 00 Glazing; plans A601, A602, A801; details A602 glass type schedule, A801 interior borrowed lite details.
Requirement summary: Required by Architect; responsible party Project Coordinator; current status APPROVED AS NOTED.